-
NSRA member
the calipers arrived today, we just need the pads so we can offer them in position over the discs to make the mounting brackets.
in the interim we collected the mk3 zephyr and chrysler 300 estate. the zephyr needs some welding (as usual), the engine bay painting and building up to a 'driver' ready to go for paint. it's getting a ford essex v6 and auto box, if the engine runs ok that is. if not a rover will be going in instead. the 300 is a diesel and doesn't always turn over, when it does it's very slow and there was talk of sparks at the back of the engine so.....
pics tomorrow.
neil.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules